Industrial Urban, a well-established concrete contractor in New Jersey, chose Peikko because of their short lead time and complete engineering support. Having utilized Peikko’s Stud Rails on previous projects Mike Weseloh, Industrial Urban's Senior Estimator, was confident that the rails would be delivered on-time for this large scale project.
“Peikko’s commitment to short lead times and great turnaround time helped us avoid construction delays. Placement drawings and engineered shop drawings were all provided quickly so the Stud Rails could be produced and delivered ahead of schedule.”